Unified Comfort Panel powers on, but WinCC Runtime will not start?
A Unified Comfort Panel can boot into its Control Panel while the operator project never opens. That is a Runtime-start question, not evidence that the PLC is in STOP. A Runtime that opens and then loses tag updates is a separate connection question.
Use the first screen that appeared
Siemens Unified panel documentation describes automatic Runtime start as a panel setting, while WinCC Unified guidance describes the loaded project starting under normal conditions. Distinguish a panel that never launches Runtime from one that launches and closes and one that remains open with stale values. The first state points to startup/project evidence; the last points to HMI–PLC communication evidence.
Operators can note the screen seen after a normal power-up, without changing panel settings. Qualified HMI personnel can compare existing Runtime messages, loaded project and panel configuration; a panel reset or project download can destroy evidence and needs authorization.
If operator screens run but show stale PLC tags, use the HMI–PLC communication resource.
Siemens official technical reference — use the edition and hardware scope stated by Siemens; this is background for interpreting evidence, not a diagnosis of a particular machine.
Does the panel boot, and what appears on screen?
Siemens' WinCC Unified Runtime startup documentation says the downloaded project normally starts automatically; its Unified Comfort Panel auto-start setting governs whether and when the project starts. These references apply to Unified panels; identify the actual HMI family before interpreting them.
Runtime never opens; Control Panel appears
If the operating system and Control Panel load but the operator project does not, the panel has started but the project Runtime has not. The auto-start configuration or project availability may be worth checking later with authorized access; neither is an established cause from this screen alone.
Runtime opens then closes
If an operator screen appears briefly, note any startup message or error already visible. A qualified person can compare project availability, transfer history and version compatibility without assuming the PLC stopped.
Runtime stays open; stale PLC values
A running operator screen with stale PLC values or a connection alarm is a communication symptom, not a Runtime startup failure. The project auto-start setting is separate from project transfer and PLC connection status.
Diagnostic goal: separate operating-system startup, project/Runtime behavior and controller communication using existing panel evidence and the authorized TIA Portal project.
Safe observations, if already known
No fault code, screenshot or project backup is needed to distinguish a Runtime startup symptom. If already visible without opening equipment or changing machine state, the panel model, screen message, whether Runtime opened and the timing of the symptom can help describe it. A qualified person can examine project files later if authorized.
Different HMI symptom?
If the project is running but shows no PLC connection, stale tags or connection alarms, see the HMI-to-PLC communication guide. An engineering laptop that cannot connect to a PLC belongs in the TIA Portal online-connection guide. When the machine stopped for an unknown reason and the HMI is only one clue, start with the machine-down overview.